Tielman’s Plans Have No Place in Canalside

The Canalside life cycle is an interesting animal. Once a windswept parking lot, it has grown to one of the most impressive attractions in Western New York as it inches towards completion. Yet, despite all of the positive momentum, the overall project remains beset by hiccups and delays.

Among the most glaring is the utter lack of permanent development outside of One Canalside (which was already there) and HarborCenter (handled by the city and the Pegulas). The historically aligned, replica canals are a visual marvel but the rest of the area is lagging behind. Make no mistake, the progress that has been made at Canalside is nothing short of impressive as there are signs of truly great things on the horizon. The warts are still quite visible, however.

Just today, The Buffalo News indicated that if an expected 2017 groundbreaking for Hofbrauhaus on the East Canal Parcel isn’t met that the German beer haus would move to the Cobblestone District. That’s certainly a win for the Parking Cobblestone District; it’s also a blow for Canalside. Filling the parcel between HarborCenter and One Canalside would add even more density to the already bustling corner while providing a new brick-and-mortar attraction for Canalside visitors to frequent with mixed use space on the second and third floors. By failing to move the underground utility lines, the city and ECHDC have let a key development parcel sit fallow while leaving Hofbrauhaus in a three-year holding pattern. Continue reading

Connecting the dots between Hofbrauhaus and Canalside

It’s been a long time since this much news has come out about Canalside in such a short period of time. Aside from one small announcement that ECHDC will be waiting to develop the north portion of the Aud Block it’s been all great news for the epicenter of Buffalo’s waterfront development.

The building on the right will be bringing a beer garden to Canalside within the next year and it might just be the home of the previously announced Hofbrauhaus.

Today’s news included a report that Pizza Plant will be occupying the ground floor retail space in One Canalside and adding another food and entertainment option to the area around Canalside and the arena. The best part of that news is that there’s potential to see Pizza Plant open and operating right around the same time that HARBORCENTER and (716) open their doors.

Another report indicated that Pizza Plant and (716) will have company along Washington Street as Benderson has begun to work on developing a yet to be unnamed beer garden for the South Block. The Buffalo News report says the beer garden is at least a year away, which would probably slate it for a late-2015 opening. Continue reading