Time for the next step after the debut of Ice at Canalside

It was almost five years in the making, but the historically aligned canals at Canalside were finally opened last night marking another milestone in Buffalo’s waterfront development.

As was to be expected, the crowd at Canalside was massive and the numbers patronizing the new skating venue will likely continue to swell over the next few weeks. All told, this was a huge victory for Canalside, the Erie Canal Harbor Corporation and Buffalo as a whole. While one night doesn’t make for guaranteed long-term success, I hope that the ECHDC are spurred to get the next piece of development done well ahead of schedule.Canalside

The three parcels that sit on the South Aud Block are shovel ready with plans for Explore & More to take up the largest of the three parcels with a restaurant and information center to occupy the other two, respectively. An RFP was issued for designs last year and now ECHDC is seeking a developer for the site. They even have pretty pictures which may or may not have no bearing on what the chosen developer builds.

Proposals from developers are due by January 9 and the ECHDC RFP notes that first round interviews will be held on or around January 22. So as of now, we’re well over a month away from identifying the developer for this site. The good news is that Explore & More has always been operating on a 2016 transition to the Canalside site, something noted in the ECHDC RFP documents. Putting two and two together tells me that once a developer is chosen, it shouldn’t be long before we see concrete being poured and structural steel rising; so long as ECHDC learned their lesson with the canals. Continue reading

Canalside is Finally Nearing its Potential

If you get the chance, take a drive down to Canalside this weekend. Every square inch of concrete has been poured on the historically aligned canals and yet another major milestone has been reached by the Erie Canal Harbor Development Corporation. Now it’s time to wait.IMG_3563

Aside from the literal waiting that will accompany the concrete’s 28-day curing process (per The Buffalo News) it also appears that we will be waiting for the next significant move from the ECHDC. Tom Dee is always careful with his words but he never hesitates to reveal significant items when the opportunity presents itself. Yesterday’s development was no different as Dee said that Canalside is well past it’s tipping point.

I have to disagree with his sentiment. This is the tipping point. Continue reading

Connecting the dots between Hofbrauhaus and Canalside

It’s been a long time since this much news has come out about Canalside in such a short period of time. Aside from one small announcement that ECHDC will be waiting to develop the north portion of the Aud Block it’s been all great news for the epicenter of Buffalo’s waterfront development.

The building on the right will be bringing a beer garden to Canalside within the next year and it might just be the home of the previously announced Hofbrauhaus.

Today’s news included a report that Pizza Plant will be occupying the ground floor retail space in One Canalside and adding another food and entertainment option to the area around Canalside and the arena. The best part of that news is that there’s potential to see Pizza Plant open and operating right around the same time that HARBORCENTER and (716) open their doors.

Another report indicated that Pizza Plant and (716) will have company along Washington Street as Benderson has begun to work on developing a yet to be unnamed beer garden for the South Block. The Buffalo News report says the beer garden is at least a year away, which would probably slate it for a late-2015 opening. Continue reading