Action at BNMC should serve as an example for entire city

With the University at Buffalo choosing the design firm for their new medical school in downtown’s burgeoning Medical Campus, things are looking up for the city’s fastest growing district.

(Buffalo Rising)

However, the winning firm (HOK), will not be building the stunning design that won out over the other four finalists will not even be built. Knowing that an internationally acclaimed firm will be leading the way to creating an iconic piece of development for a key district in the city is incredibly exciting.

The corner in which the new medical school will be built is should be bustling with action once all of the projects planned for the area are complete. According to Buffalo Rising, Women’s and Children’s Hospital will be moved nearby along with a new build from Ciminelli Development on the corner. All told, it will add up to three more serious additions to the entire district.

What I don’t understand is why the designs originally pitched for this project aren’t being considered for construction? Obviously UB and BNMC thought that HOK was more than capable of running with this project based on their submission. Why wouldn’t that submission be capable of actually being built? Hell, the New and BRO posted the pictures of the rendering as if it would be built. There are probably plenty of people thinking that construction will start on this building in the very near future. But there is  still a year left before shovels will be in the ground. Continue reading